This project encompasses the refurbishment of 224 homes across 4 buildings, and includes the replacement of lifts to upgrade to full firefighting standard, within the constraints of the existing buildings and lift shafts.

The project includes renovation of the flats & replacement of end of life Mechanical, Electrical & Plumbing systems. It also includes critical & essential works including life safety systems. Structural works include cutting an access on each floor so that the two lifts now stop at every floor & repairs to degraded concrete soffits.  

The works include responsibility for managing and coordinating the following work packages:  

Refurbishment works within apartments;
Refurbishment of communal areas;
Interim fire upgrade works;
Sprinkler installations;
Lift refurbishments including dual electrical supplies;  

The works have been planned on a phased Block by Block basis, starting with Block H following rehousing of resident clients. This will be followed by Block G once the resident clients have moved into the newly refurbished Block H La Tour Heron. The same sequence will be applied to the remaining two Blocks.  

The interim fire upgrade works (installation of communal sprinkler system & other fire protection works) will be phased in reverse order, starting with Block E; the last to be fully refurbished.